After schedule optimization Task Report tool is used to analyze cost and activities for the entire project or specific tasks within the custom time period. Charts can represent cost, cumulative cost, material, labor, equipment, and activities. All charts and data…
Automatically generated construction schedule can be easily optimized using BEXEL Manager intelligent tools. The initial task duration for the schedule can be set in settings and by default, the task duration is set to 40 working hours. Task duration can…
Clash detection status Upon creating a clash detection job the system will list all detected clashes with the default clash status New. When analyzing the clash detection list, a clash status can be set to High, Medium, Low, Undefined, Active,…
Clash View Mode To view selected clashes in the main viewport activate the Clash View Mode option. There are a few ways to do that. Select clashes by clicking on them (use CTRL key for multiple selections) and then click…
After creating zones and methodologies, a combination of Construction Methodologies and Construction Zones must be defined with the Creation Template function. Based on this Creation Template intelligent scheduling engine creates tasks and relations in an automatically generated schedule. The Creation…
The next step after defining zones is to import or create a construction methodology linked with corresponding cost items. The methodology is typically created on two levels. Uniformat (the most common) for physical-based work item segregation and Masterformat (the most…
After creating a 5D BIM model with integrated cost data, a time dimension must be added to create a 4D construction schedule. Construction schedules can be generated using different workflows described in the section Schedule. This section will briefly cover the…
After creating the Cost Classification with defined cost item codes, hierarchy, naming, quantity formula and element queries based on the templates, information about cost and resources must be additionally included. This information can be added through two different workflows. The…
With Intelligent Cost management workflow, Cost classification can be created using predefined templates and properties added through Data Enrichment Add-In. After creating a work breakdown structure using a template from the BEXEL Manager Knowledge base and Cost Classification codes added…
After the process of model enrichment is completed, added properties with cost classification codes can be used for the automated quantity take-off generation. Based on these codes, a work breakdown structure can be generated using the Quantity Take-off function. Using templates…