Smart 4D and 5D BIM management Estimated reading: 2 minutes 1799 views BEXEL Manager’s integrated open BIM approach focuses on the high utilization of available BIM data.This section will explain how to create a 4D/5D BIM model in the BEXEL Manager integrated ecosystem by summarizing detailed explanations in other sections for a clear understanding of all steps that need to be conducted to facilitate automation using advanced integrated workflows and templates from BEXEL Manager knowledge database.BEXEL Manager technology supports a complete integrated BIM workflow presented in this section through the following steps:BIM model federation processAutomated Data Validation processAutomated Model Data EnrichmentAutomated Quantity Takeoff generationAutomated creation of BIM Cost ClassificationAutomated creation of Bill of quantitiesZones (spatial organization)Schedule methodology (work sequencing)Auto-generated 4D/5D scheduleOptimized 4D/5D scheduleReporting and analyticsConstruction 4D/5D BIM simulationThis integrated approach allows maximum automation and knowledge transfer through the use of Knowledge Base templates developed and prepared with the intention to reuse it on multiple projects and enrich it through collaboration and exchange with other participants on the project. ArticlesBIM model federation process Automated Data Validation process Automated Model Data Enrichment Automated Quantity Takeoff generation Automated creation of BIM Cost Classification Automated creation of Bill of quantities Zones (spatial organization) Schedule methodology (work sequencing) Auto-generated 4D/5D schedule Optimized 4D/5D schedule Reporting and analytics Construction 4D/5D BIM simulation