BEXEL Manager – April 2026

Estimated reading: 3 minutes
Version: 26.4.1

BEXEL API

  • Fixed an issue where the working days calculation between two dates returned incorrect results.

CDE Publisher

  • Publishing to the new, significantly more performant tile-based viewer is now supported.
    • Starting with version 26.4.0.0, the publishing wizard allows users to choose which viewer to publish: New viewer, Legacy (old) viewer, or both viewers.
    • Projects published using earlier versions will continue to use the legacy viewer by default until a new project version is published.
  • Enabled publishing of schedule data for BI Analytics (weekly and monthly reporting).
    • When publishing schedules to CDE, schedule reports can be included by enabling the Export BI Data option and selecting the report type.
    • The published data includes key fields such as Actual, Remaining, Total, Material, Labor, Equipment, Subcontractor, Other Supplement Cost, Earned Value, and Planned Value, enabling more detailed analysis in BI reports.
  • Fixed an issue where updating schedules during publishing could fail when schedules contained a large number of task elements.
  • Fixed an issue where publish progress could move backward during the publishing process.

Clash Detection

  • Clash jobs can now be executed before all geometry is fully loaded, provided that the geometry for the elements included in the clash job is available.
  • Fixed an issue where errors occurred after deleting clash groups.

General

  • Improved and updated translations across the application for all supported languages.
  • Updated all related libraries to improve stability and performance across all modules.
  • Added filtering when selecting sources to be loaded into the model. Once selected, sources will be remembered.
  • Improved stability when creating projects with complex geometry (BX3 files).
  • Fixed crashes during project updates related to missing system properties.
  • Fixed an issue where the project update failed when importing building levels with duplicate IDs.

Property Checker

  • Fixed an issue where the Property Checker could not be opened even after resetting the layout.
    • A new version of the Property Checker add-in will be available for update after the first launch of the new BEXEL Manager version.

Schedule

  • Enabled direct import of schedules from Primavera databases.
    • A new option is available within the Schedule Editor (Import -> From Primavera Database…) and the Schedule ribbon tab (Import Schedule -> From Primavera Database…), allowing users to connect to a Primavera database, configure connection parameters, and select available projects for import.
  • XER importer is now the default Primavera importer.
  • Schedule exports to PDF now match the color representation in BEXEL Manager.
  • Fixed an issue where saving a project failed if the schedule was not updated.
  • Fixed an issue with MS Project XML export when exporting resources.
  • Fixed an issue where task duration increased unexpectedly during resource leveling. The default resource leveling method is now set to Stretch Task.

Schedule Animations

  • Fixed an issue where elements were incorrectly visible during animations.

Teamwork

  • Fixed an issue where using Save As could cause project crashes.
Sharing is caring

BEXEL Manager – April 2026

Or copy link

IN THIS SECTION: