How to create a 4D BIM model based on the schedule from another software?
Estimated reading: 1 minute
When conducting quality control on a model for either internal or external purposes, generating a 4D/5D animation or optimizing a schedule, 4D BIM model can be created based on the schedule from another software and all tasks linked with BIM model elements.
To create a 4D BIM model based on the schedule from another software follow the next steps:
STEP 1: Import the schedule and the model into BEXEL Manager.
STEP 2: Automated validation of property required for smart linking of elements with activities.
STEP 3: Create a custom breakdown structure based on the structure of the schedule.
STEP 4: Create smart selection sets based on the created custom breakdown for the purpose of linking the model with the schedule.