How to create a 4D BIM model based on the schedule from another software?

Estimated reading: 1 minute 195 views

When conducting quality control on a model for either internal or external purposes, generating a 4D/5D animation or optimizing a schedule, 4D BIM model can be created based on the schedule from another software and all tasks linked with BIM model elements.

To create a 4D BIM model based on the schedule from another software follow the next steps:

STEP 1: Import the schedule and the model into BEXEL Manager.

STEP 2Automated validation of property required for smart linking of elements with activities.

STEP 3: Create a custom breakdown structure based on the structure of the schedule.

STEP 4: Create smart selection sets based on the created custom breakdown for the purpose of linking the model with the schedule.

STEP 5: Link selection sets with the schedule.

STEP 6: Edit existing schedule if necessary.

STEP 7: Create a 4D animation.

Sharing is caring

How to create a 4D BIM model based on the schedule from another software?

Or copy link

IN THIS SECTION: